Project Brief:
To upgrade existing facilities and construct new welfare and conference area.

Our Approach:
The works were required to be carried out on active areas. To ensure minimal delays caused by inclement weather a full enclosed scaffold was constructed over the entire construction area allowing all works to proceed at all times. The additional cost of this type of scaffold in turn created a reduction in cost on labour and waste materials giving the client an overall saving.

 

 

Temporary welfare and offices were installed for the site staff to work from during the construction and refurbishment stages.

 

 

 

 

Outcome:
New up to date facilities that serve the clients needs with a modern day feel with both environmental and economical benefits  

Welcome Guest | Login | Register         
Case Studies Archive
Resource Centre
Gain access to our complete library of resources and electronic documents.

Drop us a line...

Ducron Construction Limited
60-62 Mortimer Street
Herne Bay
Kent CT6 5PS

T: 01227 363815
F: 01227 369267
E: Click to email us

Our Accreditation