Client: National Grid Overhead Lines
Project Type:
Drainage Culvert
Project Date:
Septemeber 2013

Project Brief:


Excavate and prepare the existing ditch to accept a new culvert. The new culvert is 20m long complete with head walls to stabilise the banks, and remove the risk of the existing foundations of the adjacent pylon being undermined.

     